§ 151.55. Compliance with regulations required.
(A)
Applicability. All site development work and operations shall comply with the requirements set forth in this section in addition to other requirements of this chapter.
(B)
Hours of operation. All site development and building construction operations shall be carried on only between the hours of 7:30 a.m. and 5:30 p.m., Monday through Friday, and 8:00 a.m. to 1:00 p.m. Saturdays, unless the Town Engineer finds that work at other times or days would not imperil or inconvenience the public, or create a nuisance, in which case he/she may by written permission, allow the work to proceed during such other hours as may be necessary. Site development and building construction operations shall not occur on New Year's Day, Martin Luther King Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, or Christmas Day.
(C)
Dust and dirt control. All graded surfaces shall be treated to prevent nuisances from dust or spillage on roads or adjacent properties. Equipment, materials, and roadways on the site shall be used in a manner or treated as to prevent excessive dust conditions.
(D)
Noise control. At all times, broadcast, recorded or amplified music shall not be audible beyond the property lines of any construction site .
(1975 Code, § 7-4.16) (Ord. 1984-317, effective 4-12-84; Am. Ord. 2016-575, effective 6-9-16; Am. Ord. 2016-577, effective 8- 25-16)